richard k. brede, pmp 5016 Linkside Dir. · Las Vegas, NV 89130 · riverton1@aol.com· H
(702)395-6787 · C (702) 682-1545 I am
team-oriented, highly motivated professional with over 20 years of experience
in project controls including planning, scheduling / cost engineering and
construction management.
Additionally,
11 years of experience in construction and start-up operations in both
government and private sectors.
I have
extensive planning and scheduling experience in large complex projects.
Experience in Nuclear, Shipbuilding, Mining and Power generation. I am a
expert user of Primavera and Microsoft Office
SUMMARY OF QUALIFICATIONS ·
Thorough knowledge of Earned Value Management Systems
(EVMS), Work Breakdown Structures (WBS), and Project Coding Structures. ·
Project Management Professional (PMP) certification. ·
Success in building and implementing Life cycle Baselines
and Fiscal Year Cost and Resource Loaded Schedules for multiple large-scale
projects. ·
Excellent oral and written communications skills, adept at
report/documentation preparation, project presentations, and teaching project
scheduling to others. ·
Strengths in planning and implementing approved scope and
budget changes consistent with formalized change control policies and
procedures. ·
Experience as Senior Control Room Operator assisting in
the completion of construction, start up, and operations of two chemical
demil plants. ·
Experience as planner / scheduler of the completion of the
construction, start up, and operations of two chemical demil plant professional Experience Consultant / Staff
Augmentation Main Scheduler2013-
Present link Technologies / boulder ConstructionLas Vegas, NV Consultant
/ Staff Augmentation ·
Developed WBS structure, coding structure, resource
library, calendars, etc. This company has never used the full version of
Primavera. Hense all administrative settings had to be established. ·
Developed initial CPM resource loaded Baseline schedule
for a $3.7M construction / renovation project for the Clark County. ·
Incorporated scope changes ·
Input and monitored monthly progress and developed monthly
progress reports On site INFRASTRUCTuRe Field
PLANNER Bechtel CorporationMoranbah / Caval Ridge mine, QLD, Australia Mining
& Metals Division ·
Field planning and monitoring of infrastructure
construction contracts, ie, main water supply line 28 km, main 66 kV supply
lines and switching yards, 66 / 11 kV substation, 11 kV above ground and
underground power distribution, 1300 bed construction camp. ·
All infrastructure and pre op testing planning. ·
Collaborated with two contractors on three contracts to
help them develop their working level resource loaded schedules. ·
Maintained and built relationships with Contractors
unfamiliar with Bechtel processes and procedures ·
Tracked and reported progress and performance monthly /
weekly progress and performance reporting dashboards for six contracts (with
the combined value of $1.7 Billion). ·
Mentored graduate student in project controls processes
and scheduling Bechtel Schedule hierarchy, Schedule and Cost processes
Advanced Schedule Analyses, Schedule Forensics, Advanced Scheduling
Techniques. ·
Mentored and trained team members how to use Planning and
Scheduling software, i.e. P6 Planning Supervisor /
Lead2011- 2013 Bechtel CorparationMoranbah & Brisbane,
QLD, Australia Mining
& Metals Division ·
Developed and maintained Level 1 Master Schedule, Level 2
and 3 schedules for the Crinum M-Block Selection, Definition phases and Early
Works ·
Developed WBS structure, coding structure, resource
library, calendars, etc. ·
Facilitated Risk Assessments for contingency planning. ·
Mentored several others on Project Controls scheduling
practices, principles and methods. Reactor LONG RANGE AND
PROJECT scheduler2010- 2011 BattelLe EneRgy allianceIdaho Falls, ID Department
of Energy National Laboratory ·
Developed, progressed and maintained Project and
Experiment schedules that were being performed at the Advanced Test Reactor
supported by the INL for Bechtel Bettis. ·
Monthly progress and performance reporting. ·
Developed resource loaded field execution schedules ·
Part of process team forming processes and procedures to
develop Long Range planning for all work affecting the Advanced Test Reactor
complex, i.e.(Experiments, maintenance, and reactor upgrades) Planner / scheduler (PCE)2009-2010 Project Services GroupRichland, WA Engineering
& staff augmentation provider ·
Developed, implemented, and integrated the Life Cycle
Baseline and Fiscal Year Task Plans, working with a yearly budget of
approximately $12 million, for the Department of Energy’s (DoE) PFP D&D
project. ·
Developed resource loaded CPM field execution schedules
for the Decommissioning & Destruction of Hanford works Plutonium
Finishing Plant ·
Updated project schedule using Primavera 6.0 ·
Maintained both cost and schedule. ·
Monthly progress and performance reporting. project controls manager2008-2009 R.A. Armfield, Inc.Las Vegas, NV Local
engineering & staff augmentation provider ·
Review, analyze, and approve contractor’s construction
baseline and progress schedules for construction and rehabilitation projects
for Clark County Water reclamation District totaling approximately $560
million. ·
Assisted Construction Project Managers in assessing
contractors’ monthly submitted schedules for accuracy. ·
Develop and revise existing customers’ desktop schedule
analysis procedures. ·
Guided the implementation to Primavera 6.2. from Primavera
P3 ·
Master scheduler established P5 base coding, user
profiles, EPS structure, WBS, etc. ·
Input to the contractual front end specifications for
scheduling requirements for contractor schedule structure and coding SENIOR project controls
specialist2007-2008 MWH americasBroomfield,
CO (work location in Las Vegas, NV) Global
Construction Company serving State & local organizations ·
Develop and maintain schedules using Primavera P3 5.0. ·
Supported the project managers in management of costs,
cost flows, durations, budgets, and change orders for 21 design and
construction projects worth $350 million in support of Clark County, NV,
Water Reclamation Capitol Improvement Project. ·
Use analytical expertise to resolve technical problems and
develop a streamlined team environment. SENIOR project controls Engineer2005-2007 Stoller-Navarro Joint Venture (SNJV)Las Vegas, NV Minority-owned
provider of engineering, environmental, & technical contractors serving
government agencies ·
Developed, implemented, and integrated the Life Cycle
Baseline and Fiscal Year Task Plans, working with a yearly budget of
approximately $10 million, for off-site work performed for the Department of
Energy (DoE) Environmental Restoration Program. ·
Developed cost estimates and resource loaded Primavera
P3e/c 5.0 schedules. ·
Performed monthly status, reporting, and forecasting of
Estimates to Complete (ETCs) and Estimates at Completion (EACs). ·
Collaborated on the development, revision, and
implementation of SNJV’s EVMS procedures in preparation of a DoE systems
certification. consultant manager2000-2002 / 2003-2005 humphrEYs & associates (2 contracts)Orange, CA EVMS
training consultants & staff augmentation personnel for government
agencies & contractors ·
Planned and implemented complete project schedule for
Sikorsky Aircraft UH-60M Upgrade Program, worth $20 million. ·
Supported development of a standard WBS for Sikorsky,
based on DoD standards. ·
Assisted in the development of a world-class EVMS and
Project Management Office (PMO) in preparation of Program Integrated Baseline
Reviews (IBRs) for government projects, as part of an implementation team. ·
Developed schedules and estimates for large foreign and US
military proposals and programs. ·
Assisted schedulers in developing detailed schedules for
full integration across Northrop Grumman Ship Building and their major
subcontractors. ·
Developed baseline schedule for Orbital Sciences Inc.,
located in Chandler, AZ. ·
Developed and taught training courses for Artemis Views
software and EVMS principles at three different sites, as part of an
implementation team at Lockheed Martin Aeronautics Company. SENIOR project
scheduler/cost analyst2002-2002 link technologies Las Vegas, NV Minority-owned
consulting firm ·
Supported Baseline Planning and Project Controls for
capital improvement construction projects, including reviewing, inputting,
and developing schedules utilizing Primavera P3.1b software. ·
Performed bi-weekly statusing and performance reporting. ·
Collaborated with project managers and estimators to
develop resource-loaded critical path schedules. SENIOR project controls
engineer1997-2000 los alamos technical associates Las Vegas, NV Engineering
& staff augmentation organization serving government agencies ·
Worked on projects for DoE contractors including CH2MHill,
Fluor Hanford Company, and Bechtel Nevada as well as national laboratories
Sandia, Los Alamos, Lawrence Livermore. ·
Integrated schedules from three groups and subcontractors
for one of the facilities within the Rocky Flats Environmental Restoration
Program. ·
Assisted in developing, maintaining, and reporting on a
fully integrated site decommissioning lifecycle schedule, with 7 project
groups and 10 sub-projects. ·
Assisted senior management in analyzing the site’s
resource forecast projections. ·
Developed and maintained a fully resource loaded
integrated baseline and working schedules for the R&D and construction
phases of an experimental gas gun complex built at the Nevada Test Site. ·
Updated schedules using Primavera’s Internet statusing
feature. ·
Collaborated with project managers and estimators to
develop, maintain, and reported progress on resource-loaded logic-driven,
critical path schedules for Bechtel’s Waste Management Group. ·
Supported the Near Term Planning process at the Hanford
Project’s Plutonium Finishing Plant. ·
Mentored new schedulers in the use of Primavera’s P3.1b
software. education Associate of Arts, Nuclear Reactor Technology Associate of Arts, Applied Arts and Sciences/Pre-Engineering COLUMBIA
BASIN COLLEGE, Pasco, WA COMPUTER SKILLS & PROGRAM
KNOWLEDGE ·
Primavera - P3(Certified User); P5; P6 (Certified User):
P8.3 (Administrator skills) ·
Pertmaster ·
Claim Digger ·
Schedule Analyzer Pro ·
Artemis Project View & Cost View ·
Basic user of Microsoft Office Word ·
Intermediate user of Microsoft Excel, Powerpoint &
Outlook ·
Advanced User Microsoft Project 2003 ·
Basic Acumen Fuse ·
Infoworks® ·
EPCworks® certifications & clearances ·
Project Management Professional (PMP) ·
Chemical Personnel Reliability Clearance, Department of
Defense (held during contract) ·
“L” Security Clearance, Department of Energy (held during
contract) 1 | Page |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
German |
Beginner |
|
|
|